Plan for Final Projects

Plan for Spring Project:

April 18- 26: research for the project, mainly on NYC, 4 tourist attractions. Collect all images and content necessary to complete the project. Figure out the theme and layout of the webpage.
April 26-30: Create Storyboard and wireframe for all pages. Begin coding a template webpage that can be manipulated to create all 20 pages in order to have a constant theme
May 1-5: Finish the template and then start working on changing each page to make it individual. Adapt it to each Tourist attraction/ Borough 
May 6-10: Finish designing each page with content and make sure to upload it in order to troubleshoot and see what can be improved
May 11-15: Take feedback and make final improvements.

Plan for Final Portfolio:

May 16-18: Decide on a final design for the portfolio, includes the way labs and projects will be displayed. Draw a storyboard and wireframe with the final design.
May 19-22: Work mainly on the Labs and Projects display, possibly use Lab 40 to find a new way to display the long list of labs and projects
May 23-25: Find other user interactive features that could raise the appeal of the page, such as making a biography
May 26-31: Start working on the overall design of the website, changing color themes and layout
June 1-5: Finish designing the Portfolio, to a final version and begin troubleshooting. Add links to VD and DD that can go back to main and WCP
Day 6-10: Make any final improvements and make sure everything is working properly


Comments

Popular posts from this blog

Lab 23-2: Type Ahead

WBL Workshop 2

Lab7 - Simple Accordion